| Container Compatibility |
Support the required ISO container lengths, commonly 20 ft, 40 ft, and 45 ft units; confirm compatibility with the selected spreader and corner-casting geometry. |
Incorrect dimensional compatibility can cause handling delays, unsafe lifting, or the need for additional equipment. |
Compare the crane layout, spreader drawings, rated load chart, and container-handling requirements based on ISO 668 and ISO 3874. |
| Safe Working Load |
Select a rated capacity that covers the heaviest planned container, spreader weight, lifting accessories, and an appropriate engineering margin. |
Capacity must account for the complete lifted load rather than the container payload alone. |
Review the certified load chart, structural calculations, overload-protection settings, and independent inspection records. |
| Overload Protection |
Use a calibrated load-measuring system with automatic hoist limitation when the rated load or a configured operating limit is exceeded. |
Helps protect the hoist, wire ropes, structure, and personnel from excessive loading. |
Conduct functional tests, calibration checks, alarm verification, and review the safety-control design against applicable local requirements. |
| Spreader Lock Monitoring |
Provide four-corner twist-lock position sensing, container-presence detection, and a permissive that prevents lifting when locking status is incomplete. |
Reduces the risk of lifting an unsecured container or releasing it before it is safely positioned. |
Test each sensor, indicator, interlock, and fault response under loaded and unloaded operating conditions. |
| Anti-Collision and Zone Protection |
Include travel-limit switches, end stops, anti-collision sensors, exclusion zones, and warning alarms appropriate to the yard layout. |
Prevents contact with adjacent gantries, vehicles, stacks, buildings, and personnel-access areas. |
Review the risk assessment, site traffic plan, sensor coverage, emergency-stop functions, and tested stopping distances. |
| Wind and Severe-Weather Protection |
Specify an anemometer, high-wind alarm, storm-pin or rail-clamping system where applicable, and a documented parked position for severe weather. |
Wind loading can affect crane stability and safe operation, particularly in exposed port and intermodal environments. |
Confirm design wind speeds, operating limits, storm conditions, anchoring arrangements, and procedures in the structural and operational documentation. |
| Automation Level |
Choose among manual, remote-supervised, semi-automated, or automated operation according to traffic volume, yard layout, labor model, and integration capability. |
Automation can improve repeatability and reduce operator exposure, but it requires reliable sensors, software, communications, and exception handling. |
Request a functional description covering positioning accuracy, remote control, obstacle detection, manual takeover, and failure recovery. |
| Positioning and Control Accuracy |
Define target accuracy for trolley travel, gantry travel, hoist positioning, container alignment, and stacking clearances based on the yard design. |
Consistent positioning supports higher stacking density and reduces container, rack, and pavement impacts. |
Use site acceptance tests with measured positions, repeatability checks, sway-control tests, and representative container movements. |
| Maintenance Access |
Provide safe access to brakes, wheels, ropes, sheaves, electrical cabinets, sensors, lubrication points, and emergency equipment. |
Accessible components reduce inspection time and help maintenance teams identify defects before they become failures. |
Inspect walkways, ladders, platforms, guarding, isolation points, lighting, fall protection, and maintenance clearances. |
| Preventive Maintenance Program |
Require a task-based schedule for daily inspections, periodic lubrication, brake and rope checks, structural inspection, electrical testing, and software backups. |
Maintenance intervals depend on duty cycle, environment, manufacturer instructions, and local regulations; a universal interval should not be assumed. |
Evaluate the maintenance manual, inspection forms, spare-parts list, technician training, and computerized maintenance records. |
| Corrosion and Environmental Protection |
Specify coatings, corrosion-resistant materials, sealed enclosures, drainage, and electrical ingress protection suitable for salt spray, rain, dust, and temperature extremes. |
Marine atmospheres accelerate corrosion and can reduce the service life of structures, connectors, cabinets, and sensors. |
Review coating systems, environmental ratings, enclosure classifications, inspection requirements, and site-specific exposure conditions. |
| Energy and Regenerative Performance |
Assess variable-frequency drives, regenerative braking, energy monitoring, standby modes, and compatibility with the available electrical supply. |
Energy recovery and efficient drives can reduce electricity consumption during frequent hoisting, lowering operating costs and emissions. |
Request measured energy data under representative duty cycles and verify power-quality, harmonic, and regenerative-load requirements. |
| Electrical and Functional Safety |
Include emergency stops, safe braking, guarded moving parts, isolation procedures, safety relays or safety controllers, and documented risk-reduction measures. |
A layered safety design limits hazardous motion and supports controlled recovery after faults or power interruptions. |
Review the risk assessment and safety-related control documentation against ISO 13849-1, IEC 60204-1, and applicable national rules. |
| Standards and Regulatory Compliance |
Identify all applicable port, occupational-safety, lifting-equipment, electrical, structural, environmental, and import requirements before procurement. |
Compliance obligations differ by country, port authority, installation location, and equipment configuration. |
Request conformity documentation and certificates relevant to the installation jurisdiction; commonly referenced standards include ISO 668, ISO 3874, ISO 13849-1, IEC 60204-1, EN 15011, and ASME B30.2 where applicable. |
| Cybersecurity and Data Integration |
Define user access controls, network segmentation, secure remote maintenance, event logging, backup procedures, and interfaces with terminal operating systems. |
Connected gantries can affect cargo flow and operational continuity if control networks or data interfaces are compromised. |
Review the network architecture, access policy, patching process, incident response plan, interface specifications, and recovery testing. |
| Lifecycle Support |
Evaluate spare-parts availability, technical documentation, training, response times, remote diagnostics, software support, and planned obsolescence controls. |
Long-term support directly affects availability, repair duration, and total cost of ownership. |
Include service-level requirements, parts lead times, training deliverables, documentation ownership, and support responsibilities in the contract. |